Vendor and proposal review
An independent review of a security technology or services proposal before you sign it, checking scope, pricing, and integration claims against what the work actually requires.
No vendor commissions · Independent of any equipment or installation relationship · Written findings on scope, cost, and gaps
WHAT THIS IS
The proposal was written by the party who profits if you sign it.
A vendor proposal is a sales document first. It is written to win the deal, not to give you an independent read on whether the scope matches your actual need, whether the pricing is reasonable, or whether the integration claims will hold up in practice.
Vendor and Proposal Review is independent of any equipment or installation relationship. G.I.S. does not sell, install, or service equipment and takes no vendor commissions, which means the review has no stake in whether you sign.
PRICING
Fixed fee, scoped by proposal complexity, not organization size.
Tier one · $1,500
Single-system proposal, such as an access control or camera quote.
Tier two · $2,500
Multi-system, integration-heavy proposal, such as a full CAD, RMS, and LPR bundle.
Tier three · Quote
RFP-stage review across multiple competing vendor proposals.
SCOPE
What is included, and what is not.
Included
- Review of scope against the actual need or design basis
- Pricing review, including whether line items match market and specification
- Integration claims checked against known system compatibility
- Identification of gaps, exclusions, and change-order risk
- Written findings memo
- One call to walk through the findings
Not included
- Vendor selection or RFP drafting (scoped separately as security technology planning)
- Contract negotiation on your behalf
- Ongoing implementation oversight
- Certification of the vendor or product
PROCESS
01 Intake
You send the proposal and any related specification or design documents.
02 Review
The proposal is reviewed against scope, pricing, and integration claims.
03 Findings
Gaps, exclusions, and risk points are documented in writing.
04 Delivery
You receive the findings memo, followed by a call to walk through it.
AFTER THE REVIEW
Proceed
Some proposals hold up well. That is a good outcome and we say so.
Renegotiate
Where gaps are found, the findings give you specific points to take back to the vendor.
Broader engagement
Where the review points to a larger technology planning need, the fee is credited toward that engagement.
Send the proposal. We will tell you what it actually covers.
